Projects

Figures & Plans Table of Contents

Figures & Plans Table of Contents

CHAPTER 1 – INTRODUCTION
Figure 1.1 Location Plan
Figure 1.1 Existing Site Plan Layout
Figure 1.1 Proposed Site Plan Layout
CHAPTER 2 – APPROACH TO EIA
No accompanying figures or plans
CHAPTER 3 – THE SITE AND SURROUNDINGS AND THE PROPOSED DEVELOPMENT
No accompanying figures or plans
CHAPTER 4 – CONSIDERATION OF ALTERNATIVES
No accompanying figures or plans
CHAPTER 5 – TRAFFIC AND TRANSPORTATION
Figure 5.1 Local area plan
Figure 5.2 Site location in context with WGIS & future developments
Figure 5.3 Site location plan
Figure 5.4 Existing United Utilities DaveyHulme WwTWs Vehicle Access Track
Figure 5.5 2km walk and 5km cycle catchment areas
Figure 5.6 Use of existing DaveyHulme WWTW construction track
Figure 5.7 Part WGIS and biomass access/Egress constructed
Figure 5.8 Part WGIS/WGIS and biomass access/Egress
Figure 5.9 Integration into part WGIS during construction
CHAPTER 6 – LANDSCAPE AND VISUAL ASSESSMENT
Figure 6.1 - 6.16 Landscape Visual Assessment and Figures
CHAPTER 7 – NOISE AND VIBRATION
Figure 7.1 Site Location & Baseline Noise Monitoring Positions
Figure 7.2 Site Layout
CHAPTER 8 – CONSTRUCTION MANAGEMENT
No accompanying figures or plans
CHAPTER 9 – HYDROLOGY AND SOIL
No accompanying figures or plans
CHAPTER 10 – ECOLOGY
Figure 10.1 Phase 1 habitat plan
Figure 10.2 Ecological enhancement plan
Figure 10.3 Ecological search
CHAPTER 11 – GROUND CONDITIONS
Figure 11.1 Ground Floor Plan Layout
CHAPTER 12 – AIR QUALITY AND HEALTH IMPACT
Figure 12.1 - 12.11 Air quality and health impact figures
Figure 12 Level 1 Plan Layout
CHAPTER 13 – INTERACTION OF EFFECTS AND CUMULATIVE EFFECTS
Figure 13 Level 2 Plan Layout
CHAPTER 14 – RESIDUAL EFFECTS & CONCLUSIONS
Figure 14 Sections Layout