Status: Operational

The Port of Sheerness was granted planning Permission on the 18th November 2013 by Swale Borough Council.

Construction of the Port of Sheerness Wind Farm Farm commenced in July 2015 and the site became fully operational on the 1st September 2016.

The scheme is located within the confines of the Port of Sheerness in the area known as ‘Lappel Bank’. 

The site comprises 4 x Senvion , MM92, 2.05MW turbines and a Sub Station that connects the output directly into the UKPN distributed network at 33KV.

The Turbines have a hub height of 78.5 and a rotor diameter of 92.5 meters  giving an overall tip height of 124.75 meters. The rotors rotate at a speed range of of 7.0 – 15.0 RPM (+12.5%)

The total Installed capacity of the site is 8.2 MW


Construction of the wind farm 2015-2016


Wind Farm Worries

For concerns about the operation of the wind farm:

•24 hour response number 01670 546055

•In the event of an emergency we will try and get suitably qualified and trained personnel to site as soon as is reasonably practicable.

•Non-emergency matters will be acknowledged and addressed the following business day if the concern was raised outside of normal business hours (0830-1800).



Further Information

Contact: Mick Humphries
Email: MHumphreys@peel.co.uk  Call: 0161 629 8420


 
 
 
 

Search our site: